External works
Neath external works
External works planned around the site, access and the next stage of construction. A particularly difficult site on a singletrack road. On a sloping site of approx 45degree, we built a raft foundation with retaining walls to the rear. All to engineered specifications. The structure was water tight to accommodate habitable rooms and lower ground floor level and parking at upper ground floor level.